20 May 2026US Industrials & TechUS Industrials & Tech: The Data Center Project Pipeline - Capacity,Construction & Cancellations (April '26)Chad Dillard+1 917 344 8469chad.dillard@bernsteinsg.comAlasdair Leslie+44 20 7762 4952alasdair.leslie@bernsteinsg.comMadison Rezaei+1 917 344 8622madison.rezaei@bernsteinsg.comMark Shmulik+1 917 344 8508mark.shmulik@bernsteinsg.comMark L. Moerdler, Ph.D.+1 917 344 8506mark.moerdler@bernsteinsg.comStacy A. Rasgon, Ph.D.+1 213 559 5917stacy.rasgon@bernsteinsg.comAlex Wang, CFA+852 2123 2613alex.wang@bernsteinsg.comDaniel Zhu+1 917 344 8309daniel.zhu@bernsteinsg.comConnor Cerniglia, CFA+1 917 344 8472connor.cerniglia@bernsteinsg.comSpecialist SalesSteve Song+1 917 344 8401steve.song@bernsteinsg.comWe introduce the first installation of our monthly Data Center Capacity Tracker series, acomprehensive monitor of N. American data center capacity by stage of development,operator, and geography. To gain recurring access to the excel-based version of thisdata feed, please reach out to your salesperson. For our server model and performanceof semi/hardware suppliers in AI supply chain, see our latest AI Server Pulse check.Project Pipeline. Over the last month, the data center project pipeline grew by 5%, up14 GW to 295 GW. Developers drove the majority of the growth this month, accountingfor 86% of the increase, followed by hyperscalers (37%), then neoclouds (13%). Of thehyperscalers, Amazon accounted for the majority of the M/M change in project pipeline.From a geographic standpoint, Texas remains the center of gravity, adding 6 GW to thepipeline or 46% of the growth, followed by Indiana, which added 2.3 GW. On a Y/Y basis,the project pipeline has grown by 3x.Under Construction. Over the last month, data center capacity under constructionincreased by 6.5 GW to 59 GW. Colocators (2.2 GW), developers (2.2 GW) and hyperscalers(1.8 GW) contributed to ~95% of new construction. Of the colocators, Vantage DataCenters drove 73% (or 1.6 GW) of the increase. Meta (1.1 GW) and Amazon (534 MW)contributed most to the hyperscalers’ increase. Construction was largest in Texas (2 GW)and Wisconsin (700 MW) driving 40%+ of new construction in the month.Stranded Capacity. The rise in local data center opposition/NIMBY is driving strandedcapacity higher. This grew by 3.4 GW to 32 GW, representing 11% of total pipeline, upfrom 7-9% last summer. During the month, developers drove 50%+ of the increase, whileanother 35% remains unaccounted for.Powering data centers with behind-the-meter power is accelerating. During themonth, the BTM pipeline grew by 2% or 3.3 GW M/M and by 30% or 28 GW YTD to 115GW. For comparison, only 13 GW of BTM capacity is currently under construction, up 3 GWM/M. Currently, only 4% of the installed base of data centers use this approach, but 22% ofthe capacity under construction will use it and 39% of the projects in the pipeline will use it....